Ideas & Methods
Constraint as Material

Constraint as Material

Practice notes · Method

Treating budgets, codes and deadlines as the primary material of a project.

Every constraint on a project was listed and then ranked by how much form it could generate. The tightest ones turned out to be the most generous.

Ranking the limits

Budget, orientation, code and time were tested one at a time to see which produced geometry rather than compromise.

Construction and material detail

main sequence — 4:3

Working pencil sketch

main sequence — sketch

one long image, then one drawing. never two drawings in a row.

the limit is the brief. everything else is preference.

Plan · diagram
Plan drawing

Matrix of constraints against generated forms.

Process · gallery
Working table with drawings and models
The project seen in its setting
Reflection

Freedom in design is not the absence of limits. It is choosing which limit to obey first.