← Ideas & Methods
Drawing in Order to Think

Drawing in Order to Think

Notebooks, ongoing · Method

A working method: never draw to present, only to find out.

The rule is simple — the first fifty drawings of anything are private, ugly and fast. Presentation drawings are only allowed once the thinking has already happened elsewhere.

Fifty before one

Volume beats precision early. The fiftieth sketch knows something the first one could not have guessed.

Construction and material detail

main sequence — 4:3

Working pencil sketch

main sequence — sketch

one long image, then one drawing. never two drawings in a row.

a beautiful early drawing is usually a lie.

Plan · diagram
Plan drawing

Sequence from first scribble to resolved section.

Process · gallery
Working table with drawings and models
The project seen in its setting
Reflection

Thinking with a pencil is slower than thinking in words, and considerably more honest.